Libtpms Libtpmsproject Libtpms

Don't miss out!

Thousands of developers use stack.watch to stay informed.
Get an email whenever new security vulnerabilities are reported in Libtpmsproject Libtpms.

By the Year

In 2026 there have been 0 vulnerabilities in Libtpmsproject Libtpms. Libtpms did not have any published security vulnerabilities last year.

Year Vulnerabilities Average Score
2026 0 0.00
2025 0 0.00
2024 0 0.00
2023 0 0.00
2022 1 6.10
2021 4 5.75

It may take a day or so for new Libtpms vulnerabilities to show up in the stats or in the list of recent security vulnerabilities. Additionally vulnerabilities may be tagged under a different product or component name.

Recent Libtpmsproject Libtpms Security Vulnerabilities

A flaw was found in libtpms
CVE-2021-3623 6.1 - Medium - March 02, 2022

A flaw was found in libtpms. The flaw can be triggered by specially-crafted TPM 2 command packets containing illegal values and may lead to an out-of-bounds access when the volatile state of the TPM 2 is marshalled/written or unmarshalled/read. The highest threat from this vulnerability is to system availability.

Memory Corruption

A flaw was found in the libtpms code that may cause access beyond the boundary of internal buffers
CVE-2021-3746 6.5 - Medium - October 19, 2021

A flaw was found in the libtpms code that may cause access beyond the boundary of internal buffers. The vulnerability is triggered by specially-crafted TPM2 command packets that then trigger the issue when the state of the TPM2's volatile state is written. The highest threat from this vulnerability is to system availability. This issue affects libtpms versions before 0.8.5, before 0.7.9 and before 0.6.6.

Buffer Overflow

A stack corruption bug was found in libtpms in versions before 0.7.2 and before 0.8.0 while decrypting data using RSA
CVE-2021-3569 5.5 - Medium - June 03, 2021

A stack corruption bug was found in libtpms in versions before 0.7.2 and before 0.8.0 while decrypting data using RSA. This flaw could result in a SIGBUS (bad memory access) and termination of swtpm. The highest threat from this vulnerability is to system availability.

Memory Corruption

A flaw was found in libtpms in versions before 0.8.0
CVE-2021-3505 5.5 - Medium - April 19, 2021

A flaw was found in libtpms in versions before 0.8.0. The TPM 2 implementation returns 2048 bit keys with ~1984 bit strength due to a bug in the TCG specification. The bug is in the key creation algorithm in RsaAdjustPrimeCandidate(), which is called before the prime number check. The highest threat from this vulnerability is to data confidentiality.

Insufficient Entropy

A flaw was found in libtpms in versions before 0.8.2
CVE-2021-3446 5.5 - Medium - March 25, 2021

A flaw was found in libtpms in versions before 0.8.2. The commonly used integration of libtpms with OpenSSL contained a vulnerability related to the returned IV (initialization vector) when certain symmetric ciphers were used. Instead of returning the last IV it returned the initial IV to the caller, thus weakening the subsequent encryption and decryption steps. The highest threat from this vulnerability is to data confidentiality.

Use of Insufficiently Random Values

Stay on top of Security Vulnerabilities

Want an email whenever new vulnerabilities are published for Libtpmsproject Libtpms or by Libtpmsproject? Click the Watch button to subscribe.

subscribe